Delivery and assembly of the roof structure made of CLT Firehouse Psáry We have completed the construction of a fire station in Psáry. The main material of this structural part is the CLT material. Parameters of realization Type of used material CLT Location Psáry (CZ) Completion date 11/2023 Scope of work